Page 1
Please check the pack contents before attempting to assemble this product. A full checklist of components is given in this leaflet. If any components are missing, please contact the John Lewis Helpline. This product is HEAVY, it should be assembled as near as possible to the point of use. TAKE CARE WHEN LIFTING to avoid personal injury and (or) damage to the product.
Page 2
Fittings and parts checklist - Bedstead Fittings 4mm Allen Key x1 20mm Screws x8 M8 x 22mm Bolt x8 Slat Connectors x14 Cap Ends x28 Centre Rail Cup x2 Parts Headboard x 1 Footboard x 1 Side Rail x 2 Centre Rail x 1 Slats x 28...
Page 3
Step by step assembly instructions - Bedstead Step One Attach the Centre Rail Cup (2) to the lower rail of the Headboard (1) and Footboard (2) using 20mm Screws (D) as shown in the diagram below. &...
Page 4
Step Two Attach the Siderails (3) to the Headboard (1) and Footboard (2) using M8 x 15mm Bolts (B) as shown below. Tighten the Bolts (B) using the 4mm Allen Key (A) provided.
Page 5
Step Three Lower the Centre Rail (4) onto the Centre Rail Cups (C) on the Headboard (1) and Footboard (2) as shown in the diagram below. &...
Page 6
Step Four Starting at the headend, insert the Slat Connectors (E) along the Centre Rail (4). Ensuring that the Slats (5) are facing curved side up, insert into the Slat Connector (E). Place a Cap End (F) onto the other end of the Slat (5) and push down fully into the pre-drilled holes along the Side Rails (3), as shown in the diagram below.
Page 8
Fittings and parts checklist - Drawers Fittings 4mm Allen Key x1 12mm Screws x24 M6 x 30mm Bolt x8 35mm Screws x12 Castors x8 Parts Drawer Fronts x 2 Drawer Left Side Panel x2 Drawer Right Side Panel x2 Drawer Back x2 Drawer Bottom x2 PLEASE NOTE: THE DRAWERS COME IN PACKS OF TWO SO THE ABOVE CONTENTS IS WHAT EACH PACK INCLUDES.
Page 9
Step One Attach the Castors (C) to the Drawer Left Panel (2) and Drawer Right Panel (3) using the 12mm Screws (D) and tighten using a screw driver as shown in the diagram below. Step Two Now attach the Drawer Left Panel (2) and Drawer Right Panel (3) to the Drawer Front (1) using M6 x 30mm Bolt (B) then tighten using 4mm Allen key as shown below.
Page 10
Step Three Slide the Drawer Bottom (5) into the groove along the Drawer Left Panel (2) Drawer Right Panel (3) and Drawer Front (1) as detailed in the diagram below. Step Four Attach the Drawer Back (4) to the Drawer Left Panel (2) and Drawer Right Panel (3) using 12mm Screw (D), 35mm Screw (E) and screw driver.
Page 11
Step Five The Drawers can now be placed under the bed and the bed is now ready for use.
It is recommended that before moving heavy objects to a new location they are completely dis-assembled If you require any additional information or have any issues with this product please call the John Lewis Helpline on 01244 689949 or e-mail mail@fwgroup-uk.com.