Test Run The Whirlpool - Kohler K-1109 Installation Manual

Bath whirlpool
Hide thumbs Also See for K-1109:
Table of Contents

Advertisement

Available languages

Available languages

8. Test Run the Whirlpool

Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation".
Kohler Co.
9
1012295-2-D

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-1151K-1357

Table of Contents