Download Print this page

Ground The Chassis - Cisco Firepower 2100 Series Manual

Rack-mount and ground the chassis
Hide thumbs Also See for Firepower 2100 Series:

Advertisement

Rack-Mount and Ground the Chassis
c) Slide the release clip toward the rear on both inner rails, and then continue pushing the chassis into the rack until the
mounting brackets meet the front of the slide rail.
Figure 8: Inner Rail Release Clip
Inner rail release clip
1
Step 7
Use the captive screws on the front of the mounting brackets to fully secure the chassis to the rack.
What to do next
• See
• Install the cables according to your software configuration as described in the

Ground the Chassis

Note
Grounding the chassis is required, even if the rack is already grounded. A grounding pad with two threaded
M4 holes is provided on the chassis for attaching a grounding lug. The grounding lug must be Nationally
Recognized Testing Laboratory (NRTL)-listed. In addition, a copper conductor (wires) must be used and the
copper conductor must comply with National Electrical Code (NEC) code for ampacity.
You need the following items that you provide:
• Wire-striping tool
• Crimping tool
Ground the Chassis, on page 9
Getting Started
Guide.
Inner rail attached to chassis
2
for the procedure to ground the Firepower 2100.
Rack-Mount and Ground the Chassis
Ground the Chassis
Cisco Firepower 2100
9

Advertisement

loading