OUT-LINE OF INSTALLATION
Installation works
3) Connecting cables to the
8. Group Control ............................................................................................21
0
1 . How to Set E.S.P...................................................................................... 2
0
Installation Parts
•
Four Type "A" screws
•
Connecting cable
•
/ ", / "
5
Pipes: Gas side .....
8
/ ", / ", / "
1
Liquid side .............
4
•
Insulated drain hose
•
Insulation materials
•
Additional Drain hose
(Inner Dia...............25mm)
2
Required tools
•
Level
•
Screw driver
•
Electric drill
•
Hole core drill (ø70mm)
•
3
Flaring Tools set
4
3
1
8
2
•
Screw driver
•
Hexagonal Wrench (4mm/5mm)
•
Gas-leak Detector
2
3