Download Print this page

GE AED08 Owner's Manual And Installation Instructions page 10

Advertisement

Available languages

Available languages

PREPARE THE AIR CONDITIONER
4
Remove the backing from the accordion
C
seal (two short strips). Stick one sealing strip
respectively on the left side and right side of
the accordion panels, as shown.
Slide the free end of the accordion panel into
D
the side panel rails. Slide the panel down. Be
sure to leave enough space to slip the top
and bottom of the frame into the rails on the
cabinet.
NOTE: There is a right and a left accordion
panel. Be sure to use the proper panel for each
side.
Top mounting rail
Slide the left and right accordion panels into
E
the top and bottom mounting rails.
Top mounting rail
Top left
Bottom mounting rail
Installation Instructions
Bottom mounting rail
Top right
10
PREPARE THE WINDOW
5
Cut the window seal (2 long strips) to the proper
length. Peel off the backing and attach the seal to
the underside of the window sash. One attached
to sash and one attached to sill.
INSTALL THE AIR CONDITIONER IN
6
THE WINDOW
Place the air conditioner on the sill with the
A
bottom mounting rail against its back edge.
Center it and close the window securely behind
the top mounting rail.
It should be level or slightly tilted to the outside.
Use a level; about a 1/3 bubble will be the correct
case slant to the outside.
3 Screws
2 Frame locking brackets
B
Extend the left and right accordion panels to
the vertical window sashes and attach 3 screws
through the holes in the upper panels, as
appropriate.
Install the frame locking brackets between the
C
bottom of the accordion panel and the window
sill. Attach with 2 screws. NOTE: To prevent the
window sill from splitting, drive the pilot holes
before driving the screws.
Sealing Strip
(with adhesive)

Advertisement

Chapters

loading

This manual is also suitable for:

Aem10Aem12