Locating The Boiler - UTICA BOILERS PEG075DID Installation, Operation & Maintenance Manual

Gas-fired steam boilers
Table of Contents

Advertisement

Locating the Boiler

Select level location as centralized with piping system,
1.
and as near chimney as possible.
Place crated boiler at selected location. Remove all
2.
crate material. Please recycle responsibly.
WARNING
!
Fire hazard. Do not install boiler on combustible
fl ooring or carpeting. Failure to follow these
instructions could result in death or serious injury.
Do not install boiler on carpeting. For installation
3.
on non-combustible fl oors only. For installation on
combustible fl ooring, special base must be used. (See
Replacement Parts Manual.)
Use metal shims under boiler base legs for fi nal leveling
4.
if needed.
Install boiler in location that permits satisfactory
5.
combustion of gas, proper venting, and maintenance
of ambient temperature at safe limits under normal
conditions of use. Boiler location should not interfere
with proper circulation of air. Introduce outside air
if normal infi ltration does not provide necessary
air. "Fresh Air for Combustion" on page 11 .
Notify owner to keep air passages free of obstruction.
6.
Ventilating and combustion air must enter boiler room
without restrictions.
Minimum Clearance Dimensions
Top
Rear
Control Side
Opposite Side
Front
Flue/Vent
Connector
Near Boiler Piping
Install boiler so automatic gas ignition system
7.
components are protected from water (dripping,
spraying, rain, etc.) during appliance operation and
service.
Draft Hood Installation
WARNING
!
Asphyxiation, carbon monoxide hazard. Failure to
follow these instructions could result in improper
combustion and possible leakage of combustion
products into the living space.
Follow directions given in Figure 3. Attach draft diverter,
and blocked vent switch. Mount vent damper. See
"Connecting Vent Damper and Vent Connector" page 12.
See Wiring Diagrams pages 24 and 25.
Table 3 -
6"
6"
7"
6"
Alcove
6"
1/2"
LOCATING THE BOILER
Figure 2 - Minimum Clearances To Combustible
Construction
7"
Figure 3 - Draft Hood Installation
Front Panel
Lift Up
Then Off
Lift up then off to remove front panel.
1.
Remove top jacket panel (4 screws).
2.
Slide draft hood over fl ue collector.
3.
Secure with 1 or 2 screws, based on boiler size.
4.
Replace top jacket panel (4 screws).
5.
Replace front panel.
6.
6
6"
Rear
6"
Boiler
Front
ALCOVE
Screws
Hood
Draft

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Peg112didPeg150didPeg187didPeg225didPeg262didPeg299did

Table of Contents