Operating Sequence - York YCAQ10 Manual

Packaged liquid chillers air cooled – reciprocating hermetic
Hide thumbs Also See for YCAQ10:
Table of Contents

Advertisement

1. PANEL SWITCHES
A. Set the Return Chilled Water Temp. to the desired
temperature. (This will be leaving water temp.
setpoint if this option is utilized.)
B. Assure the Micro Logic Board jumpers/switches
are configured for the unit design and the system's
requirement. See pages 31 & 32.
2. Place the System Switch to the ON position. See the
OPERATING SEQUENCE for unit operation. The
compressor will start and a flow of liquid should be
noted in the liquid indicator. After several minutes of
operation, the bubbles should disappear and there
will be a solid column of liquid when the unit is oper-
ating normally. On start-up, foaming of the oil may
be evident in the compressor oil sight glass. After
the water temperature has been pulled down to op-
erating conditions, the oil should be clear. Normal
operation of the unit is evidenced by a hot discharge
line, clear oil in the compressor crankcase, solid liq-
uid refrigerant in the liquid indicator and usually no
more than 2 PSIG variation in suction pressure for
any given set of operating conditions.
Check direction of fan rotation. Air flow must be "up".
Allow the compressor to run for a short time, being
ready to stop it immediately if any unusual noise or
other adverse condition should develop. When start-
ing the compressor, always make sure the oil pump
is functioning properly. Compressor oil pressure must
be as described under "Oil Pressure Cutout" (See
Control Description).
Check the system operating parameters. Do this by
selecting various readouts such as pressure and tem-
perature. Compare these to test gauge readings.
CHECKING SUPERHEAT AND SUBCOOLING
The subcooling should always be checked when charg-
ing the system with refrigerant and/or before setting the
superheat.
When the refrigerant charge is correct, there will be no
bubbles in the liquid sight glass with the system operat-
ing under full load conditions, and there will be 10° to
15°F subcooled liquid leaving the condenser.
An overcharged system should be guarded against.
Evidences of overcharge are as follows:
a. If the system is overcharged, the discharge pres-
sure will be higher than normal. (Normal discharge
pressure can be found in refrigerant temperature/
pressure chart; use ambient temperature +30°F
for normal condensing temperatures.
b. The temperature of the liquid refrigerant out of the
condenser should not be more than 15°F less than
the condensing temperature. (The temperature
corresponding to the condensing pressure from
refrigerant temperature/pressure chart.)
YORK INTERNATIONAL
The subcooling temperature should be taken by record-
ing the temperature of the liquid line at the outlet of the
condenser and recording the liquid pressure at the liq-
uid service valve and converting it to a temperature from
temperature/pressure chart.
Example:
Liquid Line Pressure 260 PSIG converted to120°F
Minus Liquid Line Temperature Subcooling 105°F
Add refrigerant to the system to increase subcooling or
remove refrigerant to lower subcooling. After the
subcooling is set at 10-15°F the superheat should be
checked.
The superheat should be checked only after steady
operation of the chiller has been established, the leav-
ing chilled liquid has been pulled down to the required
temperature, and the unit is running fully loaded. Cor-
rect superheat setting is 8° - 12°F.
The superheat is the difference between the actual tempera-
ture of the returned refrigerant gas entering the compres-
sor and the temperature corresponding to the suction pres-
sure as shown in a standard pressure/temperature chart.
Example:
Suction Temperature
Minus Suction Pressure 60 PSIG
Converted to Superheat
The suction temperature should be taken 6" before the
compressor service valve, and the suction pressure is
taken at the compressor suction service valve.
Normally, the thermal expansion valve need not be ad-
justed in the field. If, however, an adjustment is to be
made, the expansion valve adjusting screw should be
turned not more than one turn at a time, allowing suffi-
cient time (approximately 20 min.) between adjustments
for the system and the thermal expansion valve to re-
spond and return to settled operation. Make sure that
expansion valve is not cycling by watching pressures
end temperatures curing the waiting period.
If the unit has been functioning satisfactorily during the
initial operating period it is ready for continuous operation.

OPERATING SEQUENCE

(Also See Compressor Capacity Control)
1.
For the system compressor to run, all Manual Re-
set Cutouts must be reset, the Flow Switch must
be closed, and any remote cycling contacts must
be closed.
2.
As long as power is applied, the Crankcase Heater
will be on and stay on as long as the compressor
is not running.
3.
When the System Power Switch is applied, the
unit will start a 2 minute start-up timer.
FORM 150.40-NM20
= to
15°F
44°F
34°F
10°F