Installation, Commissioning And Operating Flowchart - ABB ACS800 Cabinet Installation And Operating Instruction

Drive modules
Hide thumbs Also See for ACS800:
Table of Contents

Advertisement

Installation, commissioning and operating flowchart

Task
Identify the frame size of your drive, R7 or R8.
Plan the installation.
Check the ambient conditions, ratings,
required cooling air flow, input power
connection, compatibility of the motor, motor
connection, and other technical data.
Unpack and check the units.
Check that all necessary optional modules
and equipment are present and correct.
Only intact units may be started up.
Assemble and install the drive module into the
cabinet.
Install the RDCU drive control unit.
Check the installation.
Electrical installation
Commissioning and operating the drive
Chapters in this manual
-
Planning the cabinet installation
If optional equipment is included, see
its manuals.
Mechanical installation of pre-
assembled units (ACS800-04/U4)
Mechanical installation of non-pre-
assembled units (ACS800-04M)
If the converter has been non-
operational for more than one year,
the converter DC link capacitors need
to be reformed. Ask ABB for
instructions.
Mechanical installation of pre-
assembled units (ACS800-04/U4)
Mechanical installation of non-pre-
assembled units (ACS800-04M)
-
Checking the installation
-
-
Chapters in ACS800-04/04M/U4
Hardware Manual
[3AFE64671006 (English)]
Technical data / IEC ratings or
NEMA ratings
Technical data
Planning the electrical installation
-
or
or
See RDCU Drive Control Unit
Hardware Manual
[3AFE64636324 (English)]
-
Safety, Planning the electrical
installation, Electrical installation,
Maintenance, Technical Data,
Resistor braking
See the appropriate firmware
manual.
About this manual
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents