Operating Controls - Bunn CDBC Operating & Service Manual

Bunn cdbc: service manual
Table of Contents

Advertisement

Model CEZ TWIN
ON/OFF
ON/OFF SWITCH
Placing the "ON/OFF" switch in the "ON" upper position supplies power to the brew station warmer, enables the
brew circuit, and energizes the tank refill circuit. Placing the switch in the "OFF" lower position stops tank refilling,
brewing and deenergizes the brew station warmer. Stopping a brew cycle after it has been started will not stop the
flow of water into the decanter until the funnel is empty.
NOTE – Hot water will be available at the faucet in a limited amount when the switch is in the "OFF" position because
the tank will not refill.
BREW SWITCH
Momentarily pressing and releasing the switch starts a brew cycle when the "ON/OFF" switch is in the "ON" upper
position.
NOTE – The "ON/OFF" switch must be in the "ON" upper position to initiate and complete a brew cycle.
ADDITIONAL WARMER SWITCHES
Placing any additional warmer switch in the "ON" upper position supplies power to the associated warmer.
READY INDICATOR
This indicator glows when the preselected brew water temperature has been achieved.
Model CDBC TWIN
ON/OFF SWITCH
Pressing the "ON/OFF" switch (indicator glowing) supplies power to the brew station warmer, enables the brew
circuit, and energizes the tank refill circuit. Pressing the switch again (indicator not glowing) stops tank refilling,
brewing and deenergizes the brew station warmer. Stopping a brew cycle after it has been started will not stop the
flow of water into the decanter until the funnel is empty.
NOTE – Hot water will be available at the faucet in a limited amount when the "ON/OFF" indicator is not glowing
because the tank will not refill.

OPERATING CONTROLS

BREW
FRONT-SIDE-REAR
ON/OFF
Page 5
BREW
FRONT-SIDE-REAR
29319 041599
P1870
P1869

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CezTwin

Table of Contents