Functional Test; Preliminary Inspection; Test Equipment; Figure 2 Test Equipment Connection - AUTOHELM Z219 Manual

Table of Contents

Advertisement

ST80 Active Wind Transducer

5. Functional Test

5.1 Preliminary Inspection

Before testing, inspect the equipment for physical damage (cracked or
broken case, bent/corroded/burnt connector pins, etc.). Clean off any
grease, dirt or deposits in or on the equipment.
Check for signs of water ingress. Check for damage to the pod PCB, in
particular, overheating on the power supply input pins and PCB tracks.

5.2 Test Equipment

+

Figure 2 Test Equipment Connection

3
4
1
5
2
+
6
1. Known good ST80 wind head
2. Daisychain cable
3. Power cable
4. 5A Fuse/circuit breaker
5. 12V 5A power supply
6. ST80 Active wind
transducer under test
ST80 Active Wind Service Procedures 83067-1 9
D2712-1

Advertisement

Table of Contents
loading

Related Products for AUTOHELM Z219

This manual is also suitable for:

St80

Table of Contents