Date: ________________________________________
Model Number: ________________________________
Serial Number: _________________________________
_________________________________
Technician:
 Verify all packaging material has been removed.
 Remove all shipping brackets per installation instructions.
 Verify the job site voltage agrees with the unit serial plate.
 Verify condensate connection is installed per installation instructions.
 Verify proper clearance around the unit for safety, service, maintenance and proper unit operation.
 Verify proper weatherproofing of all ductwork, roof curbs and electrical connections.
 Check that the flue screen is in place.
 Check gas piping for leaks.
 Verify gas pressure to the unit is within the range specified on the serial plate.
 Check to ensure that all fans, pulleys and wheels are secure.
 Check for proper belt tension and alignment per installation instructions.
 Check refrigerant piping for rubbing and leaks. Repair if necessary.
 Check unit wiring to ensure it is not in contact with refrigerant piping or sharp metal edges.
 Check all electrical connections and terminals. Tighten as needed.
 Verify that the crankcase heaters have been energized for 24 hours.
 Verify the scroll compressor(s) are rotating in the right direction.
 Verify all accessories are installed and operating correctly.
 Check filters and replace if necessary.
 Verify the installation of the thermostat.
Location: _____________________________________
Unit #:
Pre Start-Up
(Check each item as completed)
43
Start-up Checklist
*Store in job file
_____________________________________
_____________________________________
_____________________________________
9/2014