..........Any trademarks used in this manual are the property of their respective owners. Important: Be sure to check www.baldor.com for the latest version of this manual in Adobe Acrobat PDF format. Table of Contents i MN301...
Caution statements. If you have a question about a procedure or are uncertain about any detail, Do Not Proceed. Please contact your Baldor distributor for more information or clarification. A Warning statement indicates a possible unsafe condition that can cause harm to personnel.
NEMA MG1 and MG2 standards to avoid equipment damage. Receiving Each Baldor Electric Motor is thoroughly tested at the factory and carefully packaged for shipment. When you receive your motor, there are several things you should do immediately.
Conduit Box Conduit box can be rotated 90° or 180°. Be sure that conduit box is clean and dry after all connections are made. Be sure the box is sealed so it is dust and water tight. Installation & Operation 2-1 MN301...
Guards must be installed for rotating parts such as couplings, pulleys, external fans, and unused shaft extensions. This is particularly important where the parts have surface irregularities such as keys, key ways or set screws. 2-2 Installation & Operation MN301...
A much greater amount of heat is produced by each acceleration or jog than by the same motor under full load. If it is necessary to repeatedly start or jog the motor, it is advisable to check the application with your local Baldor distributor or Baldor Service Center. Permanent Lubrication Ball bearing with permanent lubrication can be operated about 20,000 hours (up to a maximum of 48 months) without replacement.
Page 8
World Headquarters P.O. Box 2400 Fort Smith, AR 72902-2400 USA Ph: (1) 479.646.4711, Fax: (1) 479.648.5792 www.baldor.com E 2009 Baldor Electric Company All rights reserved. Printed in USA 7/09 MN301...