Download Print this page

Symantec CAS S200 Quick Start Manual

Content analysis

Advertisement

Quick Links

Quick Start Guide
Content Analysis S200, S400, S500
01
Unpack the Appliance
Verify the contents of the shipping package for the Content Analysis appliance.
CAS S200
AC power cords (number included)
1
Grounding hardware
Null-modem serial cable
Two/four post slide-rail kit
Optional
Rack-mount ears
Safety and Regulatory Compliance Guide
Quick Start Guide (this document)
Software License Agreement
Hardware Warranty
02
Connect Cables
Symantec recommends plugging in cables, verifying LEDs, and configuring and licensing
the appliance before rack-mounting it. If you would rather rack-mount the appliance before
performing configuration tasks, skip to Step 7—Rack-Mount the Appliance.
Content Analysis
Appliance
Switch
ProxySG Appliance
Main Site
LAN
The following procedure describes a typical deployment for Content Analysis and ProxySG
appliances (as shown in the above illustration). For information on other deployments, see the
Administration & Reference WebGuide.
Note:
Network cables are not included with the appliance. Make sure to use only straight-
through Ethernet cables. For 1000Base-T operation, Symantec recommends Category 5E cables
or better (Category 6 or 6A) for distances of 330 feet (100 meters).
To deploy the Content Analysis appliance and connect its cables:
a. Deploy the
ProxySG
appliance:
o
Disconnect the Ethernet cable (if there is one) between the LAN switch and WAN router.
o
Connect the ProxySG appliance to the LAN switch with a network cable.
For SG S200 and SG S400 appliances, connect the 2:0 port to the LAN switch.
For SG S500 appliances, connect the 1:0 port to the LAN switch.
The appliance auto-negotiates 10/100/1000 Base-T speed and duplex settings.
Connect the ProxySG appliance to the WAN router with a network cable:
o
For SG S200 and SG S400 appliances, connect the 2:1 port to the WAN router.
For SG S500 appliances, connect the 1:1 port to the WAN router.
Note:
See the ProxySG Quick Start Guide for more information on ProxySG deployment.
b. Deploy the
Content Analysis
appliance:
o
Connect the Content Analysis appliance's 1:0 port to the ProxySG appliance with a
network cable. The appliance auto-negotiates the 10/100/1000 Base-T speed and duplex
settings.
Connect the Content Analysis appliance's SYS MGMT 0:0 port to the router leading to
o
the management network with a network cable.
Note:
The Content Analysis appliance must be managed through the SYS MGMT 0:0 port.
The SYS MGMT port is identified as simply 0:0 during initial configuration.
c. Connect the Content Analysis appliance's DB9 serial port to a serial terminal or workstation
with terminal emulation software. Use the included null-modem cable. The serial connection
is used to perform the appliance's initial configuration.
d. For
CAS S500
appliances, attach the lug-
CAS S400
CAS S500
equipped end of the included grounding
2
2
wire (10 AWG) to both grounding studs
on the appliance, securing it with the
star washers and M5 nuts. Attach the
other end of the grounding wire to a
proper earth-ground.
e. Connect the included AC power cord to the Content Analysis appliance's power inlet on the
rear panel. Connect the other end of the power cord to a power source. If the appliance has a
second (redundant) power supply, connect it as well.
03
Power on the Appliance and Verify LEDs
To verify the appliance is operational:
a. Confirm the appliance's power cords are securely connected to a power source.
b. If the appliance does not automatically power on, press the rear soft power switch.
Note:
The state of the appliance's soft power switch (on or off) is retained when power is
Management
removed. This may necessitate pressing the power switch when reapplying power to the
Network
appliance.
c. As the appliance boots, verify the following:
The Power LED turns amber.
o
Near the end of the boot cycle, the Power LED alternates between amber and green,
o
Router
indicating an unconfigured state.
o
Following the initial configuration (see Step 4), the Power LED turns green. In addition, the
LCD displays system statistics, which can be scrolled through with the Left/Right Arrows.
The front-panel LEDs indicate the following states::
o
Power LED
o
Sys Status LED
04
Perform the Initial Configuration
You must have the following network information to initialize the appliance:
o
Appliance IP address
Primary DNS server IP address
o
Default Gateway IP address
o
To perform the initial configuration for the appliance:
a. Confirm the appliance's DB9 serial port is connected to a serial terminal or workstation with
terminal emulation software.
b. Open a terminal emulation program such as Microsoft HyperTerminal®, PuTTY, Tera Term, or
ProComm™.
c. Configure the terminal emulation software to use the following settings:
Baud rate: 9600 bps
o
o
Parity: none
o
Flow control: none
PS 2
IOIOI
7:
(
) Off: Powered off
(
) Amber: Booting
(
) Amber/green alternating: Unconfigured
(
) Green: Powered on and configured
(
) Off: No status
(
) Green: Healthy
(
) Amber: Warning
*
(
) Amber blinking: Critical (or not licensed)
o
Subnet mask
Administrator username and
o
password
Data bits: 1
o
o
Stops bits: 8
d. Power on the appliance (if it is not already powered on) and, when prompted, press Enter
three times.
e. When prompted, enter network configuration parameters. If the appliance is connected to
a network, the Initial Configuration Wizard attempts to verify the DNS server address and
auto-detect link settings.
f. When prompted, assign a Username and Password to the administrator account.
BMC MGMT
Note:
Following the initial configuration, the System Status LED blinks amber, indicating the
appliance has not yet been licensed (see Step 5).
05
License the Appliance
After the Content Analysis appliance has been configured for network access, you must
license the appliance for full software functionality. When you purchase the appliance, you
will receive an e-fulfillment letter containing your appliance's serial number and activation
code for subscription services. All Content Analysis components require a license to operate.
After you have verified that the base license has been installed, review the subscription
components and activate them as necessary.
To register the Content Analysis appliance:
a. Go to
https://www.mysymantec.com/
and log in with MySymantec credentials.
b. Choose Licensing > Network Protection (Blue Coat) Licensing.
c. On the Network Protection Licensing Portal, on the left side, select Content Analysis Sys-
tem and click Software Anti-Virus Activation.
d. Enter the Appliance Serial Number and Activation Code (included in your e-fulfillment
letter) and click Submit.
e. When prompted with the Symantec License Agreement, select I Accept and click Submit.
The license is activated and the portal displays information about the license.
To download and install the license:
a. Open a browser and enter the appliance's IP address and port number. For example,
an IP address of 192.168.2.42 with a port number of 8082 (the default) translates to:
https://192.168.2.42:8082
b. When prompted, enter the administrator Username and Password specified during the
initial configuration, then click Login.
c. In the web management console, choose System > Licensing.
d. Click Download License from Symantec. The appliance confirms the download and installation.
To activate license components:
a. In the web management console, choose System > Licensing. The Licensing Activation sec-
tion displays the available license components, their status, and whether they are active.
b. To activate a license component, click in the Active column to enable the checkbox.
c. Click Save Changes.
06
Perform a Graceful Shutdown
Before proceeding to rack-mounting the appliance, log in to the Content Analysis CLI and
perform a graceful shutdown of the appliance.
To perform a graceful shutdown:
a. Log in to the Content Analysis CLI (see Step 4).
b. When prompted, to access the CLI, press: 1
c. To access privileged commands, enter: enable
d. When prompted, enter the enable Password specified during the initial configuration.
e. Enter: shutdown
Warning:
Do not power off the appliance with the soft power switch or by removing the power
cables! Abruptly removing power can result in irreparable data loss. Always use the shutdown
command from the CLI to power off the appliance.
Page 1

Advertisement

loading

Summary of Contents for Symantec CAS S200

  • Page 1 The Power LED turns amber. letter) and click Submit. Near the end of the boot cycle, the Power LED alternates between amber and green, e. When prompted with the Symantec License Agreement, select I Accept and click Submit. Switch Router indicating an unconfigured state.
  • Page 2 CONSEQUENTIAL DAMAGES IN CONNECTION WITH THE FURNISHING, PERFORMANCE, OR USE OF THIS DOCUMENTATION. THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS SUBJECT TO CHANGE WITHOUT NOTICE. SYMANTEC CORPORATION PRODUCTS, TECHNICAL SERVICES, AND ANY OTHER TECHNICAL DATA REFERENCED IN THIS DOCUMENT ARE SUBJECT TO U.S.

This manual is also suitable for:

Cas s400Cas s500