20 Mechanical installation – Frames R1 to R3
Free space requirements
The flange-mounted drives can be installed side by side. For free space requirements
above and below the drives, see the table.
Above
Below
mm
R1
100
R2
100
R3
115
Above
Below
in
mm
3.94
200
3.94
200
4.53
200
in
7.87
7.87
7.87