Piping Connection - Lennox eCO2Boost XS 3 Installation Instructions Manual

Split system
Table of Contents

Advertisement

6.1. Piping connection

1.  Optimal distance between CDU and unit cooler :
MT: < 30m (risk of capacity & lubrication)
LT: < 20m (risk of capacity & lubrication)
2.  Pipes Material
CDU connection
Discharge pipe only
Both (discharge and suction pipe)
3.  Pipes insulation: 32 mm.
4.  Avoid CO
pipes contact with other conducts or pipes.
2
5.  Avoid installation in corrosive environment.
Unit cooler
Condensing unit
Thermal insulation
covering the entire
length of tubing
Diameter
1/4" (6,35 mm)
3/8" (9,52 mm)
> 0°
Pipe slope
Electronic
Unit cooler
expansion valve
Solenoid
valve
Material
Hard copper
K65
Hard copper
INCORRECT
Suction pipe
CDU
Condensing unit
expansion valve
Unit cooler
8
Thickness [mm]
1
0.65
1
CORRECT
Suction pipe
Refrigerant
discharge pipe
Thermal insulation
material
Electronic
Solenoid
Valve
eCO2Boost XS 3
MWP [bar]
245
120
155
Refrigerant
discharge pipe
Thermal insulation
material
Thermal insulation
covering the entire
length of tubing
Siphon
every 5m

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco2boost l

Table of Contents