Do the following for each loop of storage expansion units:
1. Insert an SFP GBIC into the FC OUT port of upper controller A of the last disk storage expansion unit
in the loop of expansion units.
2. Insert an SFP GBIC into the FC OUT port of lower controller B of the last disk storage expansion unit
in the loop of expansion units.
3. Perform one of the following two steps (depending on which condition is true):
v If the FC IN port of controller A on the first disk storage expansion unit of the loop is attached to
controller A on the N6000 series system, then attach a fiber cable from the FC OUT port on upper
controller A of the last storage expansion unit (where you inserted the SFP GBIC in step 1) to a
Fibre Channel port on controller B on the N6000 series system. The Fibre Channel port on controller
B should be an FC port used as an initiator port for attaching disk storage expansion units, not a
Fibre Channel port configured as an FCP target port.
v If the FC IN port of controller A on the first disk storage expansion unit of the loop is attached to
controller B on the N6000 series system, then attach a fiber cable from the FC OUT port on upper
controller A of the last storage expansion unit (where you inserted the SFP GBIC in step 1) to a
Fibre Channel port on controller A on the N6000 series system. The Fibre Channel port on
controller A should be a Fibre Channel port used as an initiator port for attaching disk storage
expansion units, not a Fibre Channel port configured as an FCP target port.
4. Perform one of the following two steps (depending on which condition is true):
v If the FC IN port of controller B on the first disk storage expansion unit of the loop is attached to
controller A on the N6000 series system, then attach a fiber cable from the FC OUT port on lower
controller B of the last storage expansion unit (where you inserted the SFP GBIC in step 2) to a
Fibre Channel port on controller B on the N6000 series system. The Fibre Channel port on controller
OUT
IN
PSU
OUT
IN
PSU
OUT
IN
PSU
OUT
IN
PSU
0a
0b
0c
0d
0a
0b
0c
0d
Installation and setup instructions