Installation procedure
Anti-fouling measures
First, clean the pipe.
Position
Installation period
More than 1 month
Outdoor
Less than 1 month
Indoor
Nothing to do with period
Pipe specifi cation:
1. Pipe "a" diameter (between indoor and branch pipe) depends on indoor pipe
Indoor
(x100W)
Gas pipe (mm) Liquid pipe (mm)
22~28
36~56
71~140
226~280
Note:
AS072 AS092 gas pipe: Ø12.7mm
AS182 gas pipe/ liquid pipe: Ø15.88mm/9.52mm
2. Pipe "b" diameter (between branch pipes)
Total indoor capacity after the branch pipe (kW)
16.8KW≤X<22.4KW
22.4KW≤X<33.0KW
33.0KW≤X<47.0KW
Note:
Adjust the diameter on fi eld (changing pipe is needed)
When the latter indoor total capacity is less than 14.0kw, pipe b will use the specs as the pipe a.
c
a
a
a
a
Ø9.52
Ø6.35
Ø12.7
Ø6.35
Ø15.88
Ø9.52
Ø25.4
Ø9.52
<16.8KW
Measures
Flat the pipe end
Flat the pipe end or seal with adhesive tape
The fi rst branch pipe
b
Gas pipe (mm)
Ø15.88
Ø19.05
Ø22.22
Ø28.58
13
Liquid pipe (mm)
Ø9.52
Ø9.52
Ø9.52
Ø12.7