RECEIVING
All units leaving the factory have been inspected to ensure the shipment of high quality products and
reasonable means are utilized to properly pack the fan coil units to protect them in transit.
Carefully inspect all shipments immediately upon delivery. When damage is visible, note this fact on the
carrier's freight bill and request that the carrier send a representative to inspect the damage. This may be
done by telephone or in person, but should always be confirmed in writing.
The shipment should be unpacked in the presence of the agent so that the damage or loss can be
determined. The carrier's agent will make an inspection report and a copy will be given to the consignee for
forwarding to the carrier with a formal claim.
LOCATION
Before installation, please check the following:
1.
There must be enough space for unit installation and maintenance. Please refer to the outline and
dimensions and fig.1 for the minimum distance between the unit and obstacle.
2.
In case of installation in free blow, the unit must be installed at a minimum height of 2.5m to avoid
contact with the appliance.
3.
Please ensure enough space for piping connection and electrical wiring.
4.
Please make sure that the hanging rods can support weight of the unit.

INSTALLATION

1.
The unit is designed for concealed ceiling installation.
2.
There are holes on the top of the unit for hanging. Please refer to Fig.1. Fig.2 and Fig.3.
3.
Make sure that the top of the unit is level.
INSULATION
1.
The insulation design and materials should be complying with local and national codes and regulations.
2.
Chilled water pipes and all parts on the pipes should be insulated.
3.
It is also necessary to insulate the air duct.
Fig. 1
OBSTACLE
INSTALLATION
B
400mm
DRAIN PIPE
The suggested slope of the
drain pipe is at least 1:50
OBSTACLE
CEILLING
5
A
200mm