Final Installation Checklist - Samsung DV431AEP User Manual

Hide thumbs Also See for DV431AEP:
Table of Contents

Advertisement

installing your dryer
4. Review the Exhausting section before installing the exhaust system. Install the ductwork from your dryer
to the exhaust hood. The crimped end of the duct sections must point away from your dryer.
DO NOT use sheet metal screws when assembling ducting. These joints should be taped.
Never use plastic flexible exhaust material.
Tip for tight installations: install a section of exhaust system to your dryer before putting it in place.
Use duct tape to secure this section to your dryer, but do not cover ventilation slots at the back of the
unit in the dryer cabinet.
5. Review Electrical Requirements section.
BEFORE OPERATING OR TESTING, follow the grounding instructions in the Grounding section.
IMPORTANT – The dryer is produced for a 3-WIRE SYSTEM CONNECTION.
The dryer frame is grounded to the neutral conductor at the terminal block.
Remove the terminal block cover plate.
Insert the power cord through the hole provided in the cabinet near the terminal block.
A strain relief must be used.
Do not loosen the nuts already installed on the terminal block. Be sure they are tight.
Use a 3/8" (1cm) deep well socket.
3-WIRE system connections
A. External ground connector
B. Neutral grounding wire (green/yellow)
C. Center silver-colored terminal block screw
D. Earth wire
E. strain relief
1. Loosen or remove the center terminal block screw.
2. Connect the neutral wire (white or center wire) of the
power cord to the center, silver-colored terminal screw
of the terminal block. Tighten screw.
3. Connect the other wires to outer terminal block screws.
Tighten screws.
4. Tighten the strain relief screws.
5. Insert the tab of the terminal block cover into your
Dryer's rear panel slot. Secure the cover with a hold-down screw.
F. The power cable H05 VV-F (min.1.9m, min.2.5mm²) must be of sufficient length to be
connected to the dryer.
6. With a level, check your dryer and make necessary adjustments to the levelling legs.
7. At this time, make sure all exhaust and electrical connections are complete. Connect your dryer to the
power supply, and check operation by using the checklist below.
8. A minimum 30A circuit breaker should be used, and a switch with a minimum contact separation of 3
mm in both poles must be incorporated into the fixed wiring for dryer disconnection. The dryer should
be positioned so that the disconnection switch is easily accessible to the user.

FINAL INSTALLATION CHECKLIST

 Dryer is connected to the power supply and is properly grounded.
 Exhaust ductwork is hooked up and joints are taped.
 Plastic flexible duct is NOT used.
 Used rigid or stiff-walled flexible metal vent material.
 Dryer is leveled and is sitting firmly on the floor.
 Start your dryer to confirm that it runs, heats, and shuts off.
16_ installing your dryer
DV431AEP-03021E_EN_v7.indd Sec5:16
DV431AEP-03021E_EN_v7.indd Sec5:16
C
A
B
D
E
F
11/25/2011 12:57:17 AM
11/25/2011 12:57:17 AM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv431ae series

Table of Contents