System Start-Up

All boilers equipped with burner swing door have a potential hazard which can cause severe property
damage, personal injury or loss of life if ignored. Before opening swing door, turn off service switch to boiler
to prevent accidental firing of burner outside the combustion chamber. Be sure to tighten swing door fastener
completely when service is completed.
A. ALWAYS INSPECT INSTALLATION
BEFORE STARTING BURNER.
1. Verify that the venting, water piping, oil piping,
and electrical system are installed properly.
Refer to Installation Instructions contained in
this manual.
2. Confirm all electrical, water and oil supplies
are turned off at the source and that the vent is
clear from obstructions.
!
WARNING
Completely read, understand and follow all
instructions in this manual before attempting
start up.
.
B
FILL HEATING SYSTEM WITH WATER.
NOTICE It is important, especially in a steam
system, to properly remove the oil and dirt from
the system. Failure to clean the system can result
in erratic water lines and surging.
CLEAN HEATING SYSTEM if boiler water or
condensate return water is dirty or if erratic water
lines or surging exist after a few days of boiler
operation.
Refer to Maintenance and Service Instructions
Section of this manual for proper cleaning
instructions for water boilers.
1. HOT WATER BOILERS. Fill entire heating
system with water and vent air from system.
Use the following procedure on a series loop or
multi-zoned system installed as per Figures 4-2
and 4-3, to remove air from system when filling:
a. Close full port ball valve in boiler system
piping.
b. Isolate all zones by closing zone valves or
shut-off valves in supply and return of each
zone(s).
c. Attach a hose to vertical purge valve in
boiler system piping.
(Note - Terminate hose in five gallon bucket
at a suitable floor drain or outdoor area).
d. Starting with one zone at a time, open zone
valve or shut-off valve in boiler supply and
return piping.
e. Open purge valve.
110503-01 - 4/20
CL
!
WARNING
f. Open shut-off valve in cold water supply
piping located between the air scoop and
expansion tank.
g. Allow water to overflow from bucket until
discharge from hose is bubble free for 30
seconds.
h. When zone is completely purged of air,
close zone valve or shut-off valve. Open
zone valve to the next zone to be purged.
Repeat this step until all zones have been
purged. At completion, open all zone
valves.
i. Close purge valve, continue filling the
system until the pressure gauge reads
12 psi. Close shut-off valve in cold water
supply piping.
The maximum operating pressure of this boiler
is posted on the ASME Data Label located
on the top of the boiler. Never exceed this
pressure. DO NOT plug safety or relief valve.
NOTICE If make-up water line is equipped with
pressure reducing valve, system will automatically
fill to 12 psi. Follow fill valve manufacturer's
instructions.
j. Open full port ball valve in boiler system
piping.
k. Remove hose from purge valve.
l. Confirm that the boiler and system have no
water leaks.
C. CHECK CONTROLS, WIRING AND
BURNER to be sure that all connections are tight
and burner is rigid, that all electrical connections
have been completed and fuses installed, and
that oil tank is filled and oil lines have been tested.
D. ADJUST CONTROL SETTINGS with burner
service switch turned "ON".
1. SET ROOM THERMOSTAT about 10°F below
room temperature.
2. PRESS RED RESET Button on Primary
Control, hold button for one (1) second and
release to reset primary control.
Installation & Service Manual
!
WARNING
25