Operations Manual Thyro Power Manager
Figure 26: Timer, Programming Completed
After having completed programming, the contacts C1 and C2 should be set manually by the
buttons "C1" (down) and "C2" (up) in the same way as they would be set automatically by the
timer (at the current time)! Otherwise, the timer would set the contacts only at the next
programmed hour!
If, for example, 9:21 a.m. was programmed, both contacts, C1 and C2, would be closed or
set to ON at that time. If this is not the case, manual setting should take place. The current
state of switching is shown in the display between date and time in relatively small letters!
C1
Figure 27: Timer, Current State of Switching of C1 and C2
10
Operation
High Voltage - Danger!
Activate the Unit only if it is secured that all necessary measures for
protection against electric shock are implemented.
10.1 Regular Operation
The system is switched on in regular operation by connecting the mains voltage. If a signal is
available at the binary inputs of the power controller, which is the case for the regular
operation, the system switches on the connected lighting system directly with the highest
8000022632 BAL, EN
C2
Version: 1.7.2009
Operation
Page 45 of 45