A-6000 Physical Connection; Installation Of Outdoor Unit; Figure 5-2 Physical Installation Of A-6000 With Flat Panel Antenna - ZyXEL Communications A-6000 Quick Start Manual

High speed, long range ethernet wireless bridge
Hide thumbs Also See for A-6000:
Table of Contents

Advertisement

Please follow the procedures to test your A-6000 in office:
1. Connect the system according to the diagram above.
2. Set the MAC address for BU and RU
3. Set the SSID for BU and RU
4. Set security level as "High".
5. Set LAN IP address for BU and RU (192.168.1.1 for BU, 192.168.1.2 for RU)
6. Keep two antennas as far as possible, and do not position the antennas face to face.
7. Perform the Frequency and Data rate setting
8. Perform the FTP file transfer and Server-U for throughput test. (Depending on user's application software,
The testing result varies from PC to PC).
9. If the function is ok, perform outdoor installation and testing
5.2.

A-6000 Physical Connection

The physical cable connection of the A-6000 is shown in the following pictures.

Figure 5-2 Physical Installation of A-6000 with flat panel antenna

5.3.

Installation of outdoor unit

The installation procedures of A-6000 is described as below:
1. Choose an appropriate place for the installation. The path between sites should be clear line-of-sight.
2. Prepare a mast with a diameter of 40mm~50mm.
3. Assemble mast mount bracket as shown in Figure 5-3
15

Advertisement

Table of Contents
loading

Table of Contents