Test points at Control Board
Test points at Control Board
Yellow wire
Yellow wire
Output voltage to one of the heat elements
Output voltage to one of the heat elements
Con2
Con2
L2 (red wire) at dryer terminal block
L2 (red wire) at dryer terminal block
Should measure 240VAC
Should measure 240VAC
–
yellow wire
–
yellow wire