I01High-voltageComponents
11.CoolingtheElectricalMachine
Components
3
Switchonlight
4
Actuatetheparkingbrake
5
Activatetheparkinglock
6
Adjustheatingcontroltomaximumtemperature
7
Pressandholddownbrakepedalatthesametime
8
Presstheacceleratorpedalforlessthan10seconds(fully)
9
Thebleedingprocedureisstarted.Thebleedingproceduretakesabout12minutes.
Beforethehigh-voltagebatteryischargedortheI01isdriven,thecoolingsystemoftheelectricmotor
isfilledwithcoolantandbled.Otherwise,damagemayoccurtotheconveniencechargingelectronics,
theelectricalmachine,theelectricalmachineelectronics,therangeextenderelectricalmachineorthe
rangeextenderelectricalmachineelectronics.
11.3.Function
Thecoolantinthecoolingcircuitoftheelectricmotorcomponentsispumpedbyanelectriccoolant
pump(80 W)throughthefiveelectricmotorcomponentsandifnecessarythecoolant-coolantheat
exchanger.
Iftheairstreamisinsufficientforcoolingthecoolantintheradiator,theelectricfanisalsoswitchedon
bytheEDME.Theelectricfanhasapowerratingof400 W.
Thereisonlyoneversionofthiscoolingsystem,whichisusedinboththeEuropeanandUSversionof
thevehicle.Avariantforcoldandhotcountriesisnotoffered.
167