Pipe Insulation; Wiring Work - Samsung AM FNFDEH Series Installation Manual

Floor standing unit
Hide thumbs Also See for AM FNFDEH Series:
Table of Contents

Advertisement

Pipe insulation

Wiring Work

12
E-
NASA_Floor Stand_AM@@@FNFDEH@_IM_EN_03678A-05.indd 12
Indoor
unit
You must insulate refrigerant pipes, branch joints, distribution
header and the pipe connection part.
Make sure to prevent any gap between the insulation on the
bent part of the pipes.
Make sure that insulation is overlapped when fixing it.
Power and communication cable connection
 AMFBFDEH Series
1
Before wiring work, you must turn off all power source.
2
Indoor unit power should be supplied through the breaker
( ELCB or MCCB+ELB ) separated by the outdoor power.
ELCB: Earth Leakage Circuit Breaker
MCCB: Molded Case Circuit Breaker
ELB: Earth Leakage Breaker
3
The power cable should be used only copper wires.
4
Connect the power cable{1(L), 2(N)} among the units within maximum
length and communication cable(F1, F2) each.
5
Connect V1, V2 (for DC12V) F3, F4(for communication) when installing the
wired remote control.
Outdoor Unit
220-240V~
or
MCCB+
ELCB
ELB
Indoor Unit 1
ELCB : Essential Installation
WARNING :
Power off before connecting any wires;
Indoor PBA will be damaged while V1,V2,F3,F4 short each other.
Fix securely without any gap.
Indoor Unit 2
Indoor Unit 3
Wired Remote
Control
2016-05-09 오후 5:32:31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents