Page 2
Congratulations on your latest Target purchase. Now what? Don’t start sweating over this box of parts. This will be easy. We did the hard work for you. All you need to do is follow our simple instructions and you’ll be on your way to transforming your room in no time.
Page 3
table of contents introduction hardware parts list how to use the cam lock system assembly 7-17 QUESTIONS? Just call 1-855-MYTGTHOME (855-698-4846) for parts and service. For faster service, have the style number and dpci number ready when calling.
Page 4
hardware (H1) x 20 (H2) x 16 (H3) x 16 (H4) x 2 (H5) x 8 wooden dowel cam bolt pan head screw 1” flat head screw (H6) x 8 (H7) x 4 (H8) x 2 (H9) x 2 (H10) x 1 flat head screw bolt knob...
Page 5
exploded diagram ITEM DESCRIPTION QUANTITY top panel left side frame right side frame bottom panel back panel front rail adjustable shelf towel arm towel bar door drawer face left drawer side right drawer side drawer back drawer bottom...
Page 6
how to use the cam lock system Screw cam bolt into panel Align cam bolt(s) with cam(s) Push cam into panel - arrow feature and insert all the way into on cam top points to panel edge cross-bored hole(s) Rotate cam(s) clockwise 180° to Panels should be tight against each lock panels together other and connection should be rigid...
Page 7
step 1: attach back panel to bottom panel (H1) x 2 (H2) x 1 (H3) x 1 wooden dowel cam bolt 1.1. Carefully tap small wooden dowels into place. Leave 1/2” of the dowels sticking out. 1.2. Screw-In cam bolts must be screwed down flush. 1.3.
Page 8
step 2: attach magnet to front rail and then attach to left side frame finished edge (H1) x 6 (H2) x 5 (H3) x 5 (H10) x 1 (H4) x 2 wooden dowel cam bolt magnet pan head screw 2.1. Carefully tap small wooden dowels into place. Leave 1/2” of the dowels sticking out. 2.2.
Page 9
step 3: prepare right side frame and then attach to towel arms and bar (H2) x 5 (H2) x 5 (H7) x 4 (H7) x 4 (H12) x 1 (H12) x 1 cam bolt cam bolt bolt bolt allen wrench allen wrench 3.1.
Page 10
step 4: attach right side frame (H1) x 6 (H3) x 5 wooden dowel 4.1. Carefully tap small wooden dowels into place. Leave 1/2” of the dowels sticking out. Carefully tap small wooden dowels into place. Leave 1/2” of the dowels sticking out. 4.2.
Page 11
step 5: attach casters (H13) x 2 (H14) x 2 caster locking caster 5.1. Gently press casters into place.
Page 12
step 6: attach top panel (H1) x 6 (H2) x 5 (H3) x 5 wooden dowel cam bolt 6.1. Carefully tap small wooden dowels into place. Leave 1/2” of the dowels sticking out. 6.2. Screw-In cam bolts must be screwed down flush. 6.3.
Page 13
step 7: attach door and knob (H8) x 1 (H9) x 1 (H6) x 4 knob knob bolt small flat head screw 7.1. Align bolts with pre-drilled holes. 7.2. Align screws with pre-drilled holes. 7.3. Do not over tighten bolts. 7.4.
Page 14
step 8: install adjustable shelf (H11) x 4 shelf support 8.1. Insert shelf supports into desired hole. Different holes accommodate different shelf heights. 8.2. Angle shelf to fit between the rails and set on top of shelf supports.
Page 15
step 9: attach drawer face, sides, back and drawer bottom (H5) x 8 1” flat head screw 9.1. Align screws with pre-drilled holes. 9.2. Do not over tighten screws.
Page 16
step 10: attach hooks back panel (H6) x 4 (H15) x 2 small flat hook head screw 10.1. Align screws with pre-drilled holes. 10.2. Do not over tighten screws.
Page 17
step 11: attach knob and install drawer (H8) x 1 (H9) x 1 knob knob bolt 11.1. Align bolt with pre-drilled hole. 11.2. Do not over tighten bolt.
Page 18
2 5 l b s . p e r d r a w 3 5 l b s . p e r s h e 1. This unit has been designed for the weight shown. Exceeding this recommended weight could result in excessive “sagging”...