ADC ClearGain Dual Inline Tower Mounted Amplifier System User Manual page 10

1800 mhz and 2100 mhz dual inline tower mounted amplifier system
Table of Contents

Advertisement

ADCP-75-214 • Issue 2 • September 2006
Note: All hardware is specified in metric units. The threads are sensitive to damage.
1. When installing on a pole a clamp kit
diameters of 30 to 140 mm.
2. Before going up to the mast, temporarily remove the connector protector plugs, inspect the
7/16 DIN connectors for damage, and return the connector protector plugs to their
respective connectors.
3. Install clamps on pole and route through the mounting openings near the center of the MHU.
4. Position MHU at the desired location and tighten clamps securely.
2.2.1
Installing the MHU Ground Cable
Good grounding of the ClearGain MHU is important to protect the unit against voltage surges.
These surges may be caused by lightning or inadvertent contact with high voltage power lines.
Install the ground cable as follows:
1. Connect the ground cable to MHU bottom using M8 star washer and nut.
2. Connect the other end of the cable to a good ground (site ground) with a reliable joint.
Page 4
© 2006, ADC Telecommunications, Inc.
Figure 3. Typical MHU Clamp Mounting Kit Components
(Figure
3) is required. The kit is designed for tube

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cleargain 1800Cleargain 2100

Table of Contents

Save Article as PDF