Download Print this page

GE Arize H1000 Installation Manual page 4

Horticulture lighting system

Advertisement

Installation Steps
Mounting Option A: Hook Installation Instructions
1
Install the hooks (hangers) onto
the threaded studs. Ensure
the hooks are facing opposite
directions.
Mounting Option B: Eyebolts Installation Instructions
Eyebolt
Hex nut
1
Thread the hex nut all the way
onto the eye bolt. Then screw
the eyebolt into the threaded
boss on top of the lamp holder
assembly. Then tighten the hex
nut down the eye bolt onto
the boss to properly secure the
eyebolt.
Reflector Installation Instructions
1
Align the two holes on the
reflector to the two pins on the
side of the ballast.
2
Each hook by first sliding on
a nylon washer, then a spring
washer, and then securing with
an M6 nut.
Eyebolt
Hex Nut
Hex Bolt
Spring Washer
Flat Washer
2
For the other eyebolt, first slide
a nylon washer and a spring
washer onto one of the studs
above the ballast. Then thread
and tighten down a hexagonal
standoff onto the stud. After
that, follow the steps above to
properly secure the eyebolt into
the hexagonal stud.
x2
2
Push the other side of the
reflector down toward the
bracket side.
M6 Nut
Spring Washer
Flat Washer
3
3
3
4
Ready to mount.
Ready to mount.
CLICK!
A click will be heard once
properly installed.
To remove the reflector, retract
the two pins, then remove the
reflector.

Advertisement

loading

This manual is also suitable for:

Gehps-de1000-4cs4n1Gehps-de1000-4os4n1Gehps-de1000-4cs5n1Gehps-de1000-4os5n1Gehps-de1000-5cs4n1Gehps-de1000-5os4n1 ... Show all