Operation Instructions; Maintenance - Majestic fireplaces 7PDVS Homeowner's Installation And Operating Manual

Dv power vent system
Table of Contents

Advertisement

DV Power Vent System
Operation of the DV Power Vent System
Turn the switch ON/OFF or the wall thermostat, to the ON position.
Blower will start immediately and will purge the unit and the vent system for 45 seconds. At that point, the pilot will light
and the main burner(s) will follow.
When the switch ON/OFF or the wall thermostat, is turned to OFF, the main burner and the pilot will shut-down immedi-
ately and the blower will run for 45 seconds to clear the flue gases before turning OFF.
If the unit is ON but the flame is unstable (ON and OFF continuously), turn the switch to the OFF position and call a
serviceman to check the installation.

Maintenance

The DV Power Vent System box is a maintenance free system. The motor bearings are pre-lubricated for extended life
and no further lubrication is required.
It is recommended however to have the system checked once a year by a qualified professional.
10003262
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents