1. General
1. General
The FlexBalance EcoPlus C, including PU insulation, creates hydraulic balance between the
The FlexBalance EcoPlus C, including PU insulation, creates hydraulic balance between the
primary circuit and the secondary circuit and has four ports, a Flexvent Top automatic airvent with
primary circuit and the secondary circuit and has four ports, a Flexvent Top automatic airvent with
valve sleeve and drain cock.
valve sleeve and drain cock.
Furthermore, the FlexBalance EcoPlus C can also be used as an air and dirt separator and it is
Furthermore, the FlexBalance EcoPlus C can also be used as an air and dirt separator and it is
suitable for use in sealed heating or cooling systems using glycol-based additives (max. 50%).
suitable for use in sealed heating or cooling systems using glycol-based additives (max. 50%).
• Minimum and maximum system temperature: -10 °C up to + 110 °C.
• Minimum and maximum system temperature: -10 °C up to + 110 °C.
• Minimum and maximum operating pressure: 0.2 bar up to 10 bar.
• Minimum and maximum operating pressure: 0.2 bar up to 10 bar.
Model
Model
FlexBalance EcoPlus C 1"
FlexBalance EcoPlus C 1"
FlexBalance EcoPlus C 1
FlexBalance EcoPlus C 1
FlexBalance EcoPlus C 1
FlexBalance EcoPlus C 1
FlexBalance EcoPlus C 2"
FlexBalance EcoPlus C 2"

2. Installation

2. Installation
Following the points below will ensure that the FlexBalance EcoPlus C works properly.
Following the points below will ensure that the FlexBalance EcoPlus C works properly.
• Make sure installation is carried out by qualified personnel.
• Make sure installation is carried out by qualifi ed personnel.
• Observe local legislation and guidelines.
• Observe local legislation and guidelines.
• The FlexBalance EcoPlus C must be connected directly to the boiler(s) on the supply pipe and
• The FlexBalance EcoPlus C must be connected directly to the boiler(s) on the supply pipe and
the return pipe (see fig. 1).
the return pipe (see fi g. 1).
• See the table for the connection dimensions.
• See the table for the connection dimensions.
• To facilitate maintenance work/servicing, there must be clearance (see fig. 3) of at least 50 mm (S)
• To facilitate maintenance work/servicing, there must be clearance (see fi g. 3) of at least 50 mm (S)
above the vent, whilst below the drain cock there must be clearance of at least 150 mm (G).
above the vent, whilst below the drain cock there must be clearance of at least 150 mm (G).
• For optimum operating conditions, we recommend a flow rate of 1.2 m/s
• For optimum operating conditions, we recommend a fl ow rate of 1.2 m/s
(functional maximum 3 m/s) in the supply pipe.
(functional maximum 3 m/s) in the supply pipe.
• Install the FlexBalance EcoPlus C only after the pipes have been properly fl ushed and pressure
• Install the FlexBalance EcoPlus C only after the pipes have been properly flushed and pressure
tested.
tested.
• The FlexBalance EcoPlus C must be installed vertically.
• The FlexBalance EcoPlus C must be installed vertically.
• In order to install the FlexBalance EcoPlus C with the minimum of fuss, remove the insulation by
• In order to install the FlexBalance EcoPlus C with the minimum of fuss, remove the insulation by
detaching the Velcro.
detaching the Velcro.
• Use sealing tape between the connections of pre-mounted coupling and between the drain cock
• Use sealing tape between the connections of pre-mounted coupling and between the drain cock
and the valve sleeve of the vent.
and the valve sleeve of the vent.
• If available, slide the temperature sensor (next to the vent connection) as deep as possible into
• If available, slide the temperature sensor (next to the vent connection) as deep as possible into
the tube (internal diameter ø12).
the tube (internal diameter ø12).
• When doing this, use enough conductive paste to ensure good heat conduction.
• When doing this, use enough conductive paste to ensure good heat conduction.
• Install the vent in the valve sleeve.
• Install the vent in the valve sleeve.
• The valve end of the vent measures 22 mm (external); an air-discharge hose can easily be
• The valve end of the vent measures 22 mm (external); an air-discharge hose can easily be
attached. It must be attached in a downward arc (see fig. 2).
attached. It must be attached in a downward arc (see fi g. 2).
• Reapply insulation.
• Reapply insulation.
A
A
B
B
DN25
DN25
160
160
/
/
"
"
DN32
DN32
160
160
1
1
4
4
/
/
"
"
DN40
DN40
160
160
1
1
2
2
DN50
DN50
170
170
Dimensions (mm)
Dimensions (mm)
C
C
D
D
290
290
170
170
620
620
340
340
180
180
680
680
340
340
180
180
680
680
400
400
185
185
755
755
E
E
F
F
G
G
276
276
262
262
321
321
280
280
320
320
320
320
373
373
326
326

Advertisement

loading

This manual is also suitable for:

Flamco flexbalance ecoplus c 1 1/4Flamco flexbalance ecoplus c 1 1/2Flamco flexbalance ecoplus c 2