National Toilet Partitions HD-8122 Installation Manual

Toilet partition

Advertisement

Quick Links

HD-8122
Toilet Partition Installation
Manual
PHONE: 866-820-3579
FAX: 866-317-2786

Advertisement

Table of Contents
loading

Summary of Contents for National Toilet Partitions HD-8122

  • Page 1 HD-8122 Toilet Partition Installation Manual PHONE: 866-820-3579 FAX: 866-317-2786...
  • Page 2 ATTENTION DO NOT MIX FASTENER PACKS EACH FASTENER PACK HAS THE NECESSARY BOLTS, BARRELS AND SCREWS TO INSTALL THE RESPECTIVE PANEL, PILASTER OR DOOR. TORX HEAD BITS ARE PACKED IN THE EXTRA FASTENER PACKS. www.natpart.com 866-820-3579...
  • Page 3: Table Of Contents

    TABLE OF CONTENTS STEP PAGE 1 TOOLS REQUIRED ........4 2 GETTING STARTED ........ 5 3 MARK THE PARTITION LAYOUT .... 6 4 INSTALL THE PANELS ......8 5 INSTALL THE WALL PILASTER 5A USING LEVELING DEVICES....10 5B USING SHOE & HEEL ......12 6 INSTALL THE PILASTERS......14 7 INSTALL THE HEADRAIL .......17 8 ATTACH THE DOORS ......18...
  • Page 4: Tools Required

    1 TOOLS REQUIRED TAPE MEASURE • 4 FOOT LEVEL • RATCHET TYPE BIT DRIVER (torx head bits supplied) • FLAT HEAD SCREWDRIVER • PHILLIPS HEAD SCREWDRIVER • 1 WAY SCREWDRIVER • TWO 9/16" OPEN END WRENCHES • HAMMER • TWO 12" BLOCKS •...
  • Page 5: Getting Started

    2 GETTING STARTED 2.1 Find the packing list in the box marked “Packing List” 2.2 Check delivered materials and make sure no parts are damaged or missing. 2.3 Check dimensions in each bathroom against the shop drawings marked “For Field Use”. Make notes of differences.
  • Page 6: Mark The Partition Layout

    3 MARK THE PARTITION LAYOUT 3.1 Establish and mark the center of the panels across the back wall according to shop drawings. For end-panels and alcove-panels mark the outer edge. (See fig.3.1) 3.2 Establish and mark the panel-brackets on the back wall 18”...
  • Page 7 www.natpart.com 866-820-3579...
  • Page 8: Install The Panels

    4 INSTALL THE PANELS 4.1 Place a 12" high support in position to hold up the panels. (see fig. 4.1) 4.2 Set the panel on the support and slide the panel into the wall brackets until the bottom is ½” from the wall. 4.3 Drill the bottom bracket hole through the panel with a ¼”...
  • Page 9 www.natpart.com 866-820-3579...
  • Page 10: Install The Wall Pilaster

    5 INSTALL THE WALL PILASTER USING LEVELING DEVICES 5A.1 Place a lead anchor into the floor holes from step 3.6. 5A.2 Screw a 3/8" x 3½” threaded rod into the lead anchor. Place a 3/8" flat washer and 3/8" nut onto the rod and tighten with a 9/16" wrench to secure the lead anchor.
  • Page 11 www.natpart.com 866-820-3579...
  • Page 12: Using Shoe & Heel

    5 INSTALL THE WALL PILASTER USING SHOE & HEEL 5B.1 Mount the heel to the floor with 1½” stainless steel screws The upright part of the heel should be (FA-801). nearest the back wall. (See figure 5B.1) 5B.2 Place the pilaster onto the heel and slide the wall- pilaster into the wall brackets.
  • Page 13 www.natpart.com 866-820-3579...
  • Page 14: Install The Pilasters

    6 INSTALL THE PILASTERS Prepare the pilaster floor fasteners. For leveling device follow steps 5A.1 through 5A.3. For shoe & heel follow step 5B.1. Place the pilaster onto the leveling device (or heel) and level the top of the pilaster with the pilaster at the wall. On the back of the pilaster mark the center of the panel according to shop drawings.
  • Page 15 SEE SHOP DRAWINGS FOR DISTANCE BETWEEN PILASTERS BEFORE FASTENING PILASTERS TO FLOOR www.natpart.com 866-820-3579...
  • Page 16: Install The Headrail

    7 INSTALL THE HEADRAIL 7.1 Measure and cut the front headrail to the appropriate length. For large openings, cut the headrail as long as possible with the cut in the center of a pilaster. 7.2 Lay the headrail on top of the pilasters and slide it into the headrail wall bracket(s).
  • Page 17 www.natpart.com 866-820-3579...
  • Page 18: Attach The Doors

    8 ATTACH THE DOORS 8.1 Secure part 1 of the top hinge onto the top of the pilaster with ½" bolts and 5/8" barrels . Keep the (FA-900) (FA-951) adjustable pin in hinge part 1. (See fig. 1) 8.2 Secure part 2 of the top hinge onto the top of the door with ½"...
  • Page 19 Notes: • To increase or decrease the default door opening reposition the adjustable pin in the top hinge. The default position is 15 open. • For the best installation place the barrel through the hinge. • On inswing doors the hinge is located on the inside of the stall. On outswing doors the hinge is located on the outside of the stall.
  • Page 20: Attach The Door Hardware

    9 ATTACH THE DOOR HARDWARE 9.1 Mark the keeper position on the Pilasters. 9.1.1 For surface mounted latches, measure and mark the center of the keeper 41" above the finished floor. 9.1.2 For recessed latches, mark the center of the keeper at the height of the oval hole on the door latch plunger.
  • Page 21 Notes • For ADA and emergency access doors mount the latch near the top of the keeper so that when in the latched position the door can be lifted and opened. www.natpart.com 866-820-3579...
  • Page 22: Adjustable Aluminum Pilasters

    10 ADJUSTABLE ALUMINUM PILASTERS www.natpart.com 866-820-3579...
  • Page 23: Bolt And Barrel Sizes

    11 BOLT AND BARREL SIZES www.natpart.com 866-820-3579...
  • Page 24 866-820-3579 www.natpart.com Copyright 2003 www.natpart.com 866-820-3579...

Table of Contents