Summary of Contents for Natural Playgrounds Arbor Swing
Page 1
Trim Pieces (4) Post Joist (2) Railing Sections (2) 4x4 Posts (4) Cross bracing for installation (optional) Note: * Each post consists of two shiplap (L-notched) post halves (not shown) to be assembled on site. * Arbor Swing not shown. Page...
Page 2
6. Stand the arbor swing assembly upright and assemble the middle main joist and the top joists using a ladder to reach. We’ll install the trim pieces and the swing once the arbor swing assembly is installed in the ground.
Page 3
10. Using the hand tamp, compact any loose material at the bottom of the holes. 11. Test fit the arbor swing assembly in the post holes and make any adjustments to the hole location and the length of the post, so the post is at the appropriate height and surrounded by equal amounts of concrete when poured.