Building The Barrier Strip Assembly - National Instruments NI TB-9214 Calibration Procedure

Hide thumbs Also See for NI TB-9214:
Table of Contents

Advertisement

Building the Barrier Strip Assembly

Complete the following steps to build the barrier strip assembly.
1.
Build the barrier strip according to Figure 1.
Spade-lug colors in Figure 1 are for illustration purposes only and are used to
Note
easily differentiate chromel and constantan spade lugs.
1
E15– E15+
E14– E14+
3
1
Use a single thermocouple wire, spade lugs, spade-lug crimping tool, and mini-thermocouple connector to
make a wire assembly. Crimp the chromel spade lugs to the chromel wire to create 16 positive spade lugs.
Crimp the constantan spade lugs to the constantan wire to create 16 negative spade lugs.
2
Use the thermocouple wire, spade lugs, and spade-lug crimping tool to make 16 wires with bare leads on
one end and the spade lugs on the other end. Crimp the chromel spade lug to the chromel wire and the
constantan spade lug to the constantan wire.
3
Assemble the barrier strips and barrier strip jackets as indicated by the manufacturer.
4
Connect the wire assembly with the mini-thermocouple connector and 16 wires to the barrier strip.
4 | ni.com | NI TB-9214 Calibration Procedure
Figure 1. Building the Barrier Strip Assembly
. . .
E1– E1+
E0– E0+
2
Ex–
Ex+
4
. . .
. . .
Ex–
Ex+

Advertisement

Table of Contents
loading

Table of Contents