Verify Printer Operation - Siemens SONOLINE G20 Installation Instructions Manual

Hide thumbs Also See for SONOLINE G20:
Table of Contents

Advertisement

SONOLINE G20 System Delivery Procedure

Verify Printer Operation

1. Verify that the printer cables are connected between the printer and the G20 system.
- Verify the AC power cord is connected between the printer and the OEM shelf outlet.
Fig. 18: Printer AC Power Connections
Pos. A
Pos. B
2. Confirm that the printer BNC video and the remote cables are connected between the
printer and the I/O module.
Fig. 19: Printer BNC Video and Remote Cables
Pos. A
Pos. B
Siemens
Medical Solutions USA, Inc.
Printer AC inlet
OEM shelf AC outlet
BNC video cable
Remote cable
US06-101.812.01.02.02
10.04
Page 19 of 26
sd
19
0
SONOLINE G20

Advertisement

Table of Contents
loading

Table of Contents