Brother PC6000 Service Manual page 16

Computerized sewing machine
Hide thumbs Also See for PC6000:
Table of Contents

Advertisement

55. Attach the ZPM holder assembly using the two screws.
56. Attach the needle bar block assembly using the three springs. (Insert the needle bar clamp into needle bar crank
rod)
57. Attach the H block shaft holder using the screw. (Insert the needle bar block arm into the pin on the needle bar
block.)
58. While inserting the thread guide cover assembly into the thread release link attach using the two screws.
59. Attach the SPM holder assembly using the three screws, and couple the horizontal feed shaft and side feed
plate using the side feed plate spring.
60. Attach the set plate D using the screws.
61. Connect the motor connector, attach the main motor using the two screws and catch the motor belt.
62. Attach the bobbin winder assembly using the screw.
63. Attach the handle holder assembly using the two screws.
64. Attach the main board assembly using the two screws. Connect the 11 connectors.
65. Attach the presser holder and needle.
-14-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Super ace i

Table of Contents