Pole - Huawei PowerCube 500 User Manual

Hide thumbs Also See for PowerCube 500:
Table of Contents

Advertisement

PowerCube 500 (CPS300-N18A1H)
User Manual
Symptom

4.5 Pole

Perform maintenance periodically based on site requirements. The recommended maintenance
interval is six months.
Table 4-6 Pole maintenance checklist
Maintenan
ce Item
Appearance
Issue 02 (2019-08-30)
Possible
Solution
Cause
Check Item
Check
Method
Check whether
Visual
the pole is
observation
deformed or
tilted.
The pole is
Visual
corroded or
observation
rusty.
Copyright © Huawei Technologies Co., Ltd.
is the range of 40 V DC to 50 V DC in sunny days. If
the output voltage of a PV module is not within the
range, replace the PV module.
Maintenance
Condition
The pole is
deformed or
tilted.
The pole is
corroded or rusty.
4 Preventive Maintenance
Solution
Replace the
deformed pole.
Adjust the
tilted base.
Remove the rust
and paint it again.
NOTE
The paint color is
RAL 9016.
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cps300-n18a1h

Table of Contents