Honeywell CN70 Series Service Work Instructions page 40

Hide thumbs Also See for CN70 Series:
Table of Contents

Advertisement

TITLE
CN70 Service Work Instructions
1. Position the main logic board onto the magnesium frame.
2. Using a T7 torx driver install 3 screws and secure the main logic board to the magnesium frame with 2.5+/-0.2 in-
lbs of torque.
3. If this is a new main logic board and it is being installed in a WAN radio equipped unit a new WAN supercap will
need to be installed. Refer to the WAN Supercap operation.
4. Verify the grounding gasket in place between the scanner & camera connectors. If this is a new main logic board
you will need to install a new grounding gasket at this location. See photo below.
Continued on next page...
5. Verify the clear insulator in place on the other side of the main logic board. If this is a new main logic board you
will need to install a new insulator at this location. See photo below.
3
6. Re-install the display assembly.
7. Re-install the WAN radio assembly.
8. Re-install the Scan bracket assembly.
9. Re-install the core assembly into the top housing.
10. Re-install the bottom housing assembly.
Model
DOCUMENT NO.
CN70A,CN70E
SWICN70-000
4
PAGE
Page 40 of 45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cn70eCn70a

Table of Contents