Installation - Dell S5000 Getting Started Manual

Hide thumbs Also See for S5000:
Table of Contents

Advertisement

Figure 8. QSFP+ Port LEDs
1. Port link/activity LED
Table 5. 40GbE Port/Module LEDs
Label
Port link/activity LED

Installation

Before installing the switch, verify that you meet these guidelines:
Enough clearance to the front of the switch so you can read the LEDs.
AC/DC power cord reaches from the power outlet to the Utility-panel connector.
Switch is rack-mounted before you install the power supply modules.
Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent lighting. Make
sure that the cabling is safely away from other devices that might damage the cables. If needed, allow one RU
space between devices to provide room for cabling.
Airflow around the switch and through the vents is unrestricted.
Temperature around the unit does not exceed 104°F (40°C). If the switch is in a closed or multirack assembly, the
temperature might be higher than normal room temperature.
Humidity around the switch does not exceed 85 percent.
Altitude at the installation site is below 6600 feet.
Switch is installed in an environment as free as possible from dust and foreign conductive material (such as
metal flakes from construction activities). Cooling mechanisms, such as fans and blowers in the switch, can
draw dust and other particles causing contaminant buildup inside the chassis, which can result in system
malfunction.
LED Color/Display
Off
Green solid
Green blinking
Description
No link or interface disabled
Link present and interface
enabled
Port has activity
11