1
Figure 6. Setting the speed switch
Grounding expansion units
If only one expansion unit is being used, go to Step 6, "Installing the power
cables".
If two or more expansion units are being used continue with the following.
Using the grounding kit, fasten the lug at one end of the 0.25m grounding cable to
one of the two threaded inserts (adjacent to the power supply receptacles as
indicated by a ground symbol) at the back of the expansion unit using the M5 x
0.5-inch screw.
If additional expansion units need to be grounded, continue attaching the
grounding cables from unit to unit, overlaying the hole on one end of the
grounding cable from one to the next.
2
3
4
5
6
Header
1
2
3
4
5
6
7
8
9
1Gb 2Gb 4Gb
4Gb
2Gb
1Gb ELP
8
7
Header
Shelf ID - close-up view
Mute button
Shelf ID
In port activity LED
Out port activity LED
In port
Out port
Fault LED
Gb switch (set to 2Gb)
Installation and setup instructions
9
5