Checklist - Thermador PALPKITHW Installation Instructions Manual

Pro harmony, pro grand, and pro rangetop propane (lp) conversion kit
Hide thumbs Also See for PALPKITHW:
Table of Contents

Advertisement

Available languages

Available languages

Gas Pro Grand ranges with 4 or 6 burners
Conversion label
Foam tape, 1'' piece
Screwdriver, 1/8'' x 0.20''
Orifice, 1.05 mm (105)
Orifice, 1.15 mm (115)
Orifice, 1.26 mm (126)
Orifice, 1.46 mm (146), main oven bake
Orifice, 1.13 mm (113), aux oven bake
Orifice, 1.25 mm (125), main oven broil
Orifice, 0.813 mm (813) or "67", aux oven broil*
*This orifice is stamped "67", which means #67 DMS (Drill
Metal Standard, or wire gage number, or drill size) and is
dimensionally equal to 0.0320'' or 0.813 mm diameter.

Checklist

Each of the following steps must be completed correctly
for the appliance to function properly. Check off each step
as it is finished.
Pro Rangetop models
Ù
Disassemble the rangetop (page 9).
Step 1
Ù
Convert the regulator to LP gas (page 10).
Step 2
Ù
Change the STAR® burner orifices according
Step 3
to your model and the corresponding table
(page 10).
Ù
Check the rangetop for gas leaks (page 19).
Step 4
Ù
Reassemble the rangetop and check STAR
Step 5
burner flame performance (page 20).
Ù
Set the valve screws for the STAR burners
Step 6
(page 22).
Ù
Place the conversion label (page 23).
Step 7
Pro Harmony gas models
Qty.
1
Ù
Disassemble the rangetop (page 9).
Step 1
1
Ù
Convert the regulator to LP gas (page 10).
Step 2
1
Ù
Change the STAR burner orifices according
Step 3
3
to your model and the corresponding table
(page 10).
2
Ù
Remove the backguard (page 15).
Step 4
1
Ù
Change the main oven broil burner orifice to
Step 5
1
the 1.25 mm (125) orifice (page 15).
1
Ù
48'' models – change the aux oven broil
Step 6
1
burner orifice to the 0.75 mm (75) orifice
1
(page 15).
Ù
Remove the oven door(s) (page 16).
Step 7
Ù
Remove the kick and front panels (page 17).
Step 8
Ù
Change the main oven bake burner orifice to
Step 9
the 1.34 mm (134) orifice (page 18).
Ù
Step 10 48'' models – change the aux oven bake
burner orifice to the 0.75 mm (75) orifice
(page 18).
Ù
Step 11 Reinstall the door(s) (page 17).
Ù
Step 12 Check the rangetop and oven for gas leaks
(page 19).
Ù
Step 13 Reassemble the rangetop and check STAR
burner flame performance (page 20).
Ù
Step 14 Set the STAR burner valve screws (page 22).
Ù
Step 15 Check the broil and bake burner flame
performance (page 22).
Ù
Step 16 Reinstall the kick and front panels (page 17).
Ù
Step 17 Place the conversion label (page 23).
Pro Harmony dual fuel models
Ù
Disassemble the rangetop (page 9).
Step 1
Ù
Convert the regulator to LP gas (page 10).
Step 2
Ù
Change the STAR burner orifices according
Step 3
to your model and the corresponding table
(page 10).
Ù
Check the rangetop for gas leaks (page 19).
Step 4
Ù
Reassemble the rangetop and check STAR
Step 5
burner flame performance (page 20).
Ù
Set the valve screws for the STAR burners
Step 6
(page 22).
Ù
Place the conversion label (page 23).
Step 7
Page. 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Palpkithw5PalpkitdgwPalpkitgwPalpkitggwPalpkitgw5

Table of Contents