Bosch Worcester GREENSTAR 12i System Instruction Manual page 26

Wall hung rsf gas-fired condensing boiler for sealed central heating systems and indirect fed dometic hot water
Hide thumbs Also See for Worcester GREENSTAR 12i System:
Table of Contents

Advertisement

A - Standard Flue
B - Internal Wall Seal
C - External Wall Seal
D - Clamp
E - Extension Duct
25
FLUE INSTALLATION
A
D
E
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 12i System/24i System
C
B
This screw should
be fitted last for
easier installation
Flat at back
This screw should
be fitted last for
easier installation
when rear exit
FLUE INSTALLATION
ASSEMBLING THE FLUE
1 Slide inner collar (B) onto terminal (A)
2 Additional extensions or bends:
Push fit all extensions/bends/terminal
together and secure connections with
clamps (D). The slope of the terminal outlet
must face downwards.
FITTING THE FLUE
3 Fit the terminal (A) through the flue opening
in the wall, exposing the plastic outlet
section to the outside and fit the outer
flue collar ( C ) over the notches to secure.
4 Assemble elbow to boiler using the three
screws (see below).
Note: Screws are in boiler not in flue kit.
FITTING THE ELBOW:
Flue elbow should push directly down and
not be twisted into correct position.
Remove the 3 inner flue tube retaining
screws. The inner tube will be held in place
in the appliance.
Fit turret onto appliance and retain with the
three removed screws.
NOTE: The clamping plate flat should be at
the rear of the appliance.
ADDITIONAL NOTES AND REMINDERS:
• Ensure that all cut lengths are square and
free from burrs.
• The flue, when assembled, is fully sealed and
components are pushed home.
• The flue is set at an angle of 3° or 52mm per
1m length.
8 716 107 375a (02/05)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Worcester greenstar 24i system

Table of Contents