Samsung AM NN4 EH Series User Manual page 23

Table of Contents

Advertisement

Step 4 Installing the drain hose and
drain pipe
1
the drain socket.
2 Tighten the metal clamp as shown in the picture.
3
clamp and drain hose to insulate and fix it with clamps.
4 Insulate the complete drain piping inside the building
(field supply).
If the drain hose cannot be sufficiently set on a slope,
fit the hose with drain raising piping (field supply).
5 Push the drain hose up to insulation when connecting
the drain hose to drain socket.
Metal clamp
Large seailng pad
Drain hose
CAUTION
Drain socket
Drain hose
Drain pipe
Be sure to bond the drain
hose and the main pipe.
PVC Tube Joint
+ VP25 (OD: 32 mm, ID: 25 mm)
Drain pipe
Air ventilation
• If it is necessary to increase the height of the drain
pipe, install the drain pipe straight within 300 mm
from the drain hose port. If it is raised higher than 550
mm, there may be water leaks.
Drain hose
Band joint
connection port. This will cause water to flow backwards
when the unit is stopped, resulting in water leaks.
• Do not apply force to the piping on the unit side when
connecting the drain hose. The hose should not be
allowed to hang loose from its connection to the unit.
Fasten the hose to a wall, frame or other support as
close to the unit as possible.
Support pieces
Ceiling
20 mm or more
1/100 or more
300 to
300 mm or
550 mm
less
Ceiling
Under gradient
Ceiling
1 to 1.5 m
1/100 or more
Ceiling
English
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents