Download Print this page

Lightolier 1101FIC Instruction Sheet

Installation procedure for high wattage insulated ceiling frame-in kits

Advertisement

Quick Links

Page 1 of 2
Read and understand these instructions before installing fixture.
This fixture is intended for installation in accordance with the National Electrical Code and local regulations. To assure full compliance with local codes and
regulations, check with your local electrical inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
NOTE: I.C. Frame-In Kit may be used in direct contact with insulation.
Fig. B
Fig. A
Wire-In
Frame-In
Warning: Use Only With Lightolier Reflector Trims Marked With I.C. Lamping Information.
Use of Other Manufacturers' Trims Voids the Underwriters Laboratories Listing and Could Constitute A Fire Hazard
1. FRAME-IN (Fig. A)
Locate fixture along joist and line up bottom edge of HINGED MOUNTING BAR
with the bottom of joist and fasten in place.
5 3/4" 2001FR
5 1/4" 1004ICX
5 5/8" 1101FIC
5 7/8" 2001FIC
6 3/8" 1001FIC
6"
Note: Integral nail version available
For Joist Spacing Less Than 16" On Center (To 12" On Center):
• MOUNTING BAR CHANNELS can be shortened and used as nailing
legs in tight spaces. Simply remove INNER BAR from holed CHANNEL,
bend CHANNEL at appropriate point and use extra screw to secure it
to the joist. (Fig. G)
All manuals and user guides at all-guides.com

New Construction

Fig. C
Swing-Up
CENTER LINE OF
APERTURE OPENING
1101FIC
HINGED MOUNTING BAR
Instruction Sheet Number
Installation Procedure for High Wattage Insulated Ceiling
Frame-In Kits 100IFIC, 1101FIC, 2001FIC
Fig. D
Close-In
BEND AT HOLE
For suspended ceilings:
• Rotate HINGED BAR ENDS to position shown and fully extend bars.
• Crimp bottom of edge of CHANNEL to prevent rotation of
HINGED BAR ENDS.
• Bend NON-HINGED end of mounting bar at featured hole location and
extend out.
• Position notched area of MOUNTING BARS onto T-BAR and lock by
bending TAB underneath T-BAR BEAD as shown.
• For suspended ceiling, make certain that bottom of Mounting Frame is no
higher than 1" above ceiling line.
HINGED BAR ENDS
CHANNEL
Lightolier
a Genlyte company
631 Airport Road, Fall River, MA 02720 • (508) 679-8131 • Fax (508) 674-4710
We reserve the right to change details of design, materials and finish.
C0611
© 2007 Genlyte Group LLC • B0607
1101FIC
Fig. E
Fig. F
Snap-On
Push-Up
TAB
BEND AT TAB
T-BAR
TAB
Fig. G
www.lightolier.com

Advertisement

loading

Summary of Contents for Lightolier 1101FIC

  • Page 1: New Construction

    Close-In Snap-On Push-Up Frame-In Warning: Use Only With Lightolier Reflector Trims Marked With I.C. Lamping Information. Use of Other Manufacturers’ Trims Voids the Underwriters Laboratories Listing and Could Constitute A Fire Hazard 1. FRAME-IN (Fig. A) BEND AT HOLE Locate fixture along joist and line up bottom edge of HINGED MOUNTING BAR with the bottom of joist and fasten in place.
  • Page 2 All manuals and user guides at all-guides.com...

This manual is also suitable for:

100ific2001fic