Space requirements
<Spaces with developed ceiling>
MCU
MCU
Bulkhead
Hallway
Hallway
<There is no risk of noise transfer>
<There is a risk of noise transfer>
Minimize the size of the hole between the walls and the pipe connection. After the installation, block the gap
12 English