Download Print this page

Advertisement

Quick Links

Rough-in Box
RF300
Installation Instructions

Advertisement

loading

Summary of Contents for Meridian RF300

  • Page 1 Rough-in Box RF300 Installation Instructions...
  • Page 2 3mm in each pole shall be incorporated into the electrical installation of the building. contacts de 3 mm minimum entre chaque pôle, doit être ajouté à l'installation électrique du bâtiment. Permanent connection of Meridian Rough-In box to mains: Connexion permanente du boîtier d'encastrement Meridian au secteur : 1) Isolate the mains before connection.
  • Page 3 Button Head Screw (1 Piece) (4 Pieces) These instructions are for installing a Meridian Rough-in Box RF300 in a ceiling (or wall). For a new ceiling/wall under construction (Start here at 2 ), or an existing ceiling/stud wall (Start at 4 ). This product can also be installed in a brick...
  • Page 4 Installation - New build Joists Brace Rough-in Box Battens (Studs) ‘A’ Fixing screws (Not supplied) No8 x 25 (Min) Pan Head Self-tapping screw 6 positions Dimension ‘A’ Ensure that 250mm Front edge of Rough-In (10”) of SpeakerLink Box needs to protrude Cable is present beyond joists &...
  • Page 5 Installation - New build Plaster board (Drywall) removed for clarity Fixing Screws Plaster board (Drywall) shown in position Without Trim Frame Make sure front edge of Rough-in box is 2 to 4mm proud of the plaster board (Drywall) surface. Su cent for a suitable thickness of plaster. Once depth of Rough-in Box is decided upon, tighten fixing screws (minimum 6 places) in slots.
  • Page 6 Installation - Existing build Marking Template Position the Marking Template on the ceiling in the required position, circular cut-out shows position of wide-range driver. Draw around the perimeter. This presents a cutting guide for the hole required for the Rough-in Box Position of DSP320 Controls Marking Template Centre of Rough-in Box...
  • Page 7 Thread 2 o wooden Battens (Studs) through the apperture and fix loosely on either side of the hole, level with the cut edge of the hole. Ensure the battens (studs) are approximately 300mm (11.8“) apart. Allow for approximately 250mm (10”) of mains\ac power &...
  • Page 8 An all pole mains\ac power switch with a contact separation of at least 3mm in each pole shall be incorporated into the electrical installation of the building. Permanent connection of Meridian Rough-In box to mains: 1) Isolate the mains\ac power before connection.
  • Page 9 Preparing for Plaster & Paint Once Brace is removed, fit Painting/Plastering Remove Brace Mask Brace fixing screws Check that approximately 250mm (10”) SpeakerLink & mains\ac power (If yet to be connected) cable is present Once Plaster board (Drywall) installation is complete, fit ‘Painting/Plastering Mask’...
  • Page 10 Plastering & making good Painting/Plastering Mask omitted for clarity Installation of Rough-In Box without Trim Frame 1) Fix the Rough-In Box so that front edge protrudes 2 to 4mm above surface of ceiling. Su cent for a suitable thickness of plaster.
  • Page 11: Dimensional Drawing

    Dimensional drawing 2 to 4mm For finish plaster Shown with Marking ‘A’ Template in place Section ‘A’-’A’ 50mm (2”) SpeakerLink SpeakerLink Wide-range driver position Mains\AC Power ‘A’ 103.00 (4”) 299.50 (11.8”) Rough-in Box O/A width Rough-in Box O/A depth 302.50 (11.9”) Ceiling/Wall cut-out Total weight of DSP320 Speaker which will be installed in this Rough-In Box - 6kg (13.2 lbs)