WARNING! Risk of Fire!
opening is greater than 3 inches. Secure wire mesh to top of framing.
ROOM CEILING
MEZZO36/36ST-C = 48 IN. MIN.
MEZZO48/48ST-C = 48 IN. MIN.
MEZZO60/60ST-C = 48 IN. MIN.
MEZZO72/72ST-C = 67-1/2 IN. MIN.
MEZZO36/36ST-C = 76-1/2 IN. MIN.
MEZZO48/48ST-C = 76-1/2 IN. MIN.
MEZZO60/60ST-C = 76-1/2 IN. MIN.
MEZZO72/72ST-C = 95 IN. MIN.
Measurement from top edge
* Wire mesh required for front discharge or open top discharge passive heat installations with discharge
opening of 3 inches or greater.
Wire mesh recommended for front discharge or open top discharge passive heat installations with discharge opening
of less than three inches.
Figure 3.7 Good Faith TV Guidelines - Passive Heat Option
Heat & Glo • MEZZO36-C/ST-C, MEZZO48-C/ST-C, MEZZO60-C/ST-C, MEZZO72-C/ST-C Owner's Manual • 2600-981 Rev. C • 10/19
Good Faith Guidelines for TV Installations
Above a MEZZO-C Fireplace with Passive Heat Option
(Single-Sided Appliance Shown)
Wire mesh required on bottom of discharge opening when discharge
1-1/2 IN. (2 X 4 FRAMING)
4 IN. MIN.
TV
12 IN. MIN.
of opening to bottom of
appliance = 24-1/2 IN.
2 IN. MIN.
CHASE CEILING (1/2 INCH WALL SHEATHING/FINISHING MATERIAL)
REQUIRED FOR FRONT AND SIDE DISCHARGE
CANNOT BE INSTALLED ON OPEN TOP DISCHARGE
1/2 IN. X 1/2 IN.
WIRE MESH*
WIRE MESH*
2 X 4 FRAMING
2 X 4 OR 2 X 6
FRAMING
= PASSIVE HEAT
DISCHARGE OPENING
FIREPLACE
OPENING