Operation - Hilti TE 50 Original Operating Instructions

Hide thumbs Also See for TE 50:
Table of Contents

Advertisement

Ambient temperature for operation
Ø hammer drill bits
Ø hammer drill bits
Ø drill bits for wood
Ø drill bits for wood
Ø drill bits for metal
Ø drill bits for metal
5

Operation

5.1 Preparations at the workplace
CAUTION
Risk of injury! Inadvertent starting of the product.
▶ Unplug the supply cord before making adjustments to the power tool or
before changing accessories.
Observe the safety instructions and warnings in this documentation and on
the product.
5.1.1 Fitting the side handle
1. Release the side handle clamping band by turning the handle grip.
2. Slide the side handle clamping band over the chuck from the front and
into the recess provided.
3. Bring the side handle into the desired position.
4. Tighten the side handle clamping band by turning the handle grip.
12
English
Printed: 14.12.2018 | Doc-Nr: PUB / 5283568 / 000 / 03
TE 50­AVR
1 ℉ ...140 ℉
(−17 ℃ ...60 ℃)
1/2 in ...1 1/4 in
12 mm ...32 mm
1/4 in ...1 3/8 in
6 mm ...35 mm
1/4 in ...1/2 in
6 mm ...13 mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Te 50-avr

Table of Contents