Siemens Desigo Touch Series Installation And Commissioning Instructions page 10

Table of Contents

Advertisement

10 / 22
Siemens
Building Technologies
Tap Manual
Manual.
1.
Complete all
Complete all fields.
2.
Finish with Next.
Finish with
3.
---> The server connection page opens.
> The server connection page opens.
Enter IP address or URL of the PXG3.W100.
Enter IP address or URL
4.
---> This ought to be defined in XWP prior to this action.
> This ought to be defined in XWP prior to this action.
> This ought to be defined in XWP prior to this action.
Complete with Finish.
Complete with
5.
---> The process may take a few seconds. The
> The process may take a few seconds. The page with the location defin
tion opens.
opens.
Enter both Location and Password.
Enter both
6.
--->
This is not the user password, and it must also not match the user
password!
password!
7.
Tap OK
OK to finish.
---> This concludes
> This concludes "Binding". The main view for the desired project is di
played within a few seconds.
played within a few seconds.
Desigo Touch and Web
Desigo Touch and Web
Commissioning – Touch panel commissioning – Step-by-step
Commissioning
page with the location defini-
password, and it must also not match the user
. The main view for the desired project is dis-
CM111029en_04
2014-08-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pxm40Pxm5

Table of Contents