Installation
Instructions
BEFORE YOU BEGIN
Read these instructions carefully and completely.
IMPORTANT
– Save these instructions for
local inspector's use.
IMPORTANT
– Observe all governing codes
and ordinances.
Note to Installer – Be sure to leave these instructions
with Consumer.
Introduction
These instructions cover the installation of the standard
walls. Fasteners are field supplied. The air conditioner and
unassembled. It must be field assembled prior to installation.
IMPORTANT: DO NOT remove thermal insulation from
sleeve.
Packaged Contents
Panel
A corrugated weather barrier is also included. If required, it
weather protection.
Selecting Location
Use the following guide for selecting the proper sleeve
location
carpet), except for installations using subbase. See
Subbase Installations section.
2. For cord-connected air conditioner, an electrical receptacle
must be located within reach of the power cord.
Voltage
230/208v
30 (762)
265v
length.
Standard Metal Wall Sleeve
Packaged Terminal Air Conditioner RAB80
The sleeve is shipped
Weather
Barrier
INSIDE
BOTTOM
Top Panel
Right Side
Panel
Bottom
Panel
Push Pins
Right of Sleeve
70 (1778)
Note to Consumer – Keep these instructions for
future reference.
Skill level – Installation of this appliance requires
basic mechanical and electrical skills.
Subbase Installations
When installing a subbase to support the sleeve or an
electrical receptacle for the power cord, the sleeve must
project a minimum of 2 3/4 inches into the room to have room
for the subbase and receptacle box. The sleeve must be
installed between 3 1/4 to 5 1/2 inches (maximum) above floor
(including carpeting).
IMPORTANT: If the sleeve projects more than 4 inches into a
room, the maufacturer recommends that a subbase or leveling
or cantilevering into the room.
Wall Preparation
contruction practices are essential to a trouble-free sleeve
installation.
Wall Opening Size: Recommended minimum wall
opening is 42 1/4" wide by 16 1/8" high.
Wood/steel Framing: Build a frame to the minimum wall
Framing and Minimum Wall Sleeve Opening
Main Stud
42 1/4"
16 1/8"
Jack Stud
Cripple
Floor
Sub-Floor
Masonry Walls: Create the recommended minimum wall
support block or bricks above wall opening. The sleeve should
supplied). If the opening is framed in wood, use wood screws
to secure the sleeve.
Curtain Walls: Use case angles to create the recommended
installations such as curtain walls, window walls, or where the
structural material of the wall is insufficient to support or fasten
the wall sleeve to. Case angles are pieces of steel or similar
material that are formed to a 90° angle. Add holes to fasten the
case angle to the sleeve and to the structural component of
the wall Do not drill holes into the bottom of the sleeve.
Jack Stud
Header 4" x 4" or
(2) 2" x 4" on edge
31-5000176 10-18 GEA
1

Advertisement

loading

Summary of Contents for Hotpoint RAB80

  • Page 1 Installation Standard Metal Wall Sleeve Instructions Packaged Terminal Air Conditioner RAB80 BEFORE YOU BEGIN Read these instructions carefully and completely. Note to Consumer – Keep these instructions for IMPORTANT – Save these instructions for future reference. local inspector’s use. Skill level – Installation of this appliance requires basic mechanical and electrical skills.
  • Page 2: Installation Instructions

    Installation Instructions Sleeve Installation (cont.) Assemble Wall Sleeve 1. Set the bottom panel Front View Cardboard on a clean, flat, level Weather Barrier Level side surface. to side Align panel in the left Mounting bottom panel slot. Insert Clips the left panel into the Front View bottom panel until all Bottom...
  • Page 3: Instructions D'installation

    Instructions Gaine murale métallique standard d’installation Conditionneur d’air terminal monobloc RAB80 AVANT DE COMMENCER Read these instructions carefully and completely. IMPORTANT – Conservez ces instructions à électroménager exige des compétences de base en mécanique et électricité. l’usage de l’inspecteur local.
  • Page 4 Instructions d’installation Assemblage de la gaine murale Installation de la gaine (suite) Cardboard Front View Mettre de niveau péries en carton Weather Barrier Level side d’un côté à l’autre to side et de niveau. Haut gauche. Alignez le panneau Mounting montage Clips le panneau gauche dans le...
  • Page 5: Instrucciones De Instalación

    Instrucciones Carcasa de pared Metálica Estándar de Instalación Acondicionador de Aire de Paquete Terminal RAB80 ANTES DE COMENZAR Lea estas instrucciones en su totalidad y atentamente. IMPORTANTE – Conserve estas electrodoméstico requiere un nivel básico de instrucciones para uso del inspector local.
  • Page 6: Instalación De La Carcasa

    Installation Instructions Ensamble la Carcasa de Pared Instalación de la Carcasa (cont.) 1. Ajuste el panel inferior Barrera Climática de Cardboard sobre una superficie Front View Cartón Weather Barrier despejada, plana y Level side lado nivelada. to side Parte 2. Ubique el panel lateral superior izquierdo.