Preparing For Installation; Verify Customer Order; Physical Inspection; Systems Voltage Settings - GE LOGIQ A3 Basic Service Manual

Table of Contents

Advertisement

GE H
EALTHCARE
D
5213326-100, R
IRECTION
Section 3-3Preparing for Installation
3-3-1

Verify Customer Order

Compare items received by the customer to that which is listed on the delivery order. Report any items
that are missing, back ordered or damaged.
3-3-2

Physical Inspection

3-3-2-1

Systems Voltage Settings

Verify that the recieved scanner is set to the correct voltage.
The Voltage ratings for the LOGIQ A3 Scanner is found on Rating label near the Circuit Breaker at the
rear of the system
CONNECTING A LOGIQ A3 SCANNER TO THE WRONG VOLTAGE LEVEL WILL
WARNING
WARNING
MOST LIKELY DESTROY THE SCANNER.
3-3-2-2

Video Formats

Check that the video format is set to the locally used video standard, NTSC or PAL.This can be done
in the setup menu.(Refer to Chapter 13 of the Basic Users Manual for the procedure for change in the
settings)
3-3-3

EMI Protection

This unit has been designed to minimize the effects of Electo-Magnetic Interference (EMI). Many of the
covers, shields, and screws are provided primarily to protect the system from image artifacts caused by
this interference. For this reason, it is imperative that all covers and hardware are installed and secured
before the unit is put into operation.
3-3-4

Checking the Components

When a new system arrives, check that nonne of the components are damaged or in short supply. If
shipping damage or shortage occurs, contact the address shown in Chapter-Introduction.
If the Power Plug is Modified or replaced to Suit the local Conditions and regulations, Ground
continuity check should be performed between Ground Pin on the Plug and the Metal Part on
CAUTION
the LOGIQ A3. Refer Section
Approv e d Docu m ent - 5213326-100TPH_r3.pdf Page 68 of 252
3
EVISION
10-6-4
for more details.
Chapter 3
LOGIQ™ A3 S
M
ERVICE
ANUAL
3-11

Advertisement

Table of Contents
loading

Table of Contents